Salmi Road Kuwait
General maintenance of salmi road in kuwait.
9/17/20252 min read
GENERAL MAINTENANCE OF SALMI ROAD, KUWAIT

Earth Works (Excavation & Backfilling)
Subgrade Preparation, Aggregate Subbase and Base Course.
Asphalt Milling and Repair Works
Asphalt Road Works (Prime Coat, Tack Coat, Type 1, Type 2 & Type 3 (Super Pave))
Road Marking and Signages
Street Furnishing (Kerb Stone, Interlock Tiles, Pavers etc.)
Storm Drainage Networks, irrigation Networks, Micro Tunnelling, CCTV works etc.
Bridge Repair Works (Expansion Joints, Bearings, Metal Handrails etc.)
Highway Fence and Guardrails
Median Barriers and Bridge parapets
Project Scope
PROJECT OWNER
Ministry of Public Works (MPW)
CONTRACTOR
LIMAK İNŞAAT SANAYI VE TICARET A.Ş.
SUB CONTRACTOR
Untied Gulf Construction Company
UGCC
The scope of work covers comprehensive road and infrastructure construction and maintenance activities, including earthworks such as excavation, backfilling, and subgrade preparation, along with aggregate subbase and base course installation. It further entails asphalt milling, repair, and full road works with prime coat, tack coat, and various asphalt layers (Type 1, Type 2, and Type 3 Super Pave). Supporting elements include road markings, signages, street furnishings (kerbstones, interlock tiles, pavers), as well as storm drainage and irrigation networks, micro tunneling, and CCTV installations. The scope also extends to bridge repair works involving expansion joints, bearings, and metal handrails, in addition to highway fences, guardrails, median barriers, and bridge parapets, ensuring durable, safe, and fully integrated transport infrastructure.


CONTRACT VALUE
62,250,000 USD
(19,100,000 KWD)
DATE OF COMMENCEMENT
2024-11-05
DATE OF COMPLETION
2027-11-05